Supplier Evaluation Form
Supplier:
|
Phone No:
| ||||||||||||||||||||||||||||
Street:
|
Fax No:
| ||||||||||||||||||||||||||||
P.O. Box:
|
State:
| ||||||||||||||||||||||||||||
City:
|
Zip:
| ||||||||||||||||||||||||||||
Person completing survey
|
Date
| ||||||||||||||||||||||||||||
Main products or services:
| |||||||||||||||||||||||||||||
Facility Size (Sq. Ft.):
| |||||||||||||||||||||||||||||
Employees
| |||||||||||||||||||||||||||||
Total:
|
Manufacturing:
|
Quality:
|
Shifts:
| ||||||||||||||||||||||||||
What processes are performed?
| |||||||||||||||||||||||||||||
Management and Organization
| |||||||||||||||||||||||||||||
Head of Quality:
|
Title:
| ||||||||||||||||||||||||||||
Reports to:
|
Title:
| ||||||||||||||||||||||||||||
Other Contacts:
|
Title:
| ||||||||||||||||||||||||||||
Other Contacts:
|
Title:
| ||||||||||||||||||||||||||||
To what quality standard does your quality manual comply?
| |||||||||||||||||||||||||||||
Is the company currently registered or certified to ISO 9001, AS9100, QS 9000,
| |||||||||||||||||||||||||||||
Nadcap, Guide 25 or other recognized 3rd party system?
| |||||||||||||||||||||||||||||
Yes
|
No
| ||||||||||||||||||||||||||||
If Yes - provide a copy of the registration certificate and completion the remainder of this survey is not required.
| |||||||||||||||||||||||||||||
If the above was No, complete the remainder of this survey.
| |||||||||||||||||||||||||||||
What is the company’s intentions, if any, for any future registration?
| |||||||||||||||||||||||||||||
Quality System Requirements
| |||||||||||||||||||||||||||||
Yes
|
No
|
N/A
| |||||||||||||||||||||||||||
1.
|
Does the company maintain an inspection system which ensures product conformance to contract
Requirements?
| ||||||||||||||||||||||||||||
2.
|
Is the inspection system documented and made available for customer review?
| ||||||||||||||||||||||||||||
3.
|
Does the inspection system contain previsions for notifying customers for any significant change in quality management or inspection system?
| ||||||||||||||||||||||||||||
4.
|
Does the company provide documented inspection and testing instructions to ensure inspection and test of material, work in process, and completed articles?
| ||||||||||||||||||||||||||||
5.
|
Are adequate records of all inspections and tests, including results, type of defects, quantities and required corrective actions maintained?
| ||||||||||||||||||||||||||||
6.
|
Does the company maintain a system to ensure prompt action to correct assignable conditions, which resulted or could have resulted in a submission of nonconforming material or services to the customer?
| ||||||||||||||||||||||||||||
7.
|
Does the company maintain a system to ensure timely response to any corrective action requests from customers?
| ||||||||||||||||||||||||||||
8.
|
Is there a system to provide controls, which ensure that the latest applicable drawings, specifications, and instructions required by the P.O.; as well as, authorized changes thereto, are used for manufacture, inspection, and testing?
| ||||||||||||||||||||||||||||
9.
|
Does the company provide and maintain gages and other measuring and test devices necessary to assure all delivered product or service is conforming?
| ||||||||||||||||||||||||||||
10.
|
Is applicable inspection, measurement, and test
devices calibrated at established intervals against
certified masters, which are traceable to national
standards?
| ||||||||||||||||||||||||||||
11.
|
Are special process controls an integral part of the
inspection system when such processes are part of
the purchase order?
| ||||||||||||||||||||||||||||
12.
|
Does the company maintain a system which ensures that special process procedures are not modified without prior approval of the customer?
| ||||||||||||||||||||||||||||
13.
|
Is there a system that maintains positive identification
of the inspection of the inspection (manufacturing)
status of all product?
| ||||||||||||||||||||||||||||
14.
|
When the customer furnishes material, does the
Company’s system address the following minimum
requirements?
| ||||||||||||||||||||||||||||
a) Examination upon receipt, consistent with
practicability, to detect damage in transit.
| |||||||||||||||||||||||||||||
b) Inspection for completeness and proper type
and quantity.
| |||||||||||||||||||||||||||||
c) Periodic inspection and precautions to assure
adequate storage conditions.
| |||||||||||||||||||||||||||||
d) Identification and protections from improper use
and disposition.
| |||||||||||||||||||||||||||||
15.
|
Does the system provide for reporting any customer furnished material found damaged or otherwise unsuitable for use?
| ||||||||||||||||||||||||||||
16.
|
Does the inspection system address an effective and
positive system for controlling nonconforming
material?
| ||||||||||||||||||||||||||||
17.
|
If it is determined that nonconforming material may
have inadvertently been shipped to the customer,
does the inspection system address immediate
customer notification?
| ||||||||||||||||||||||||||||
18.
|
Are any sampling plans used by the company
approved by the customer?
| ||||||||||||||||||||||||||||
19.
|
Are subcontracted or purchased material and
services subjected to receiving inspection and any
other controls, as required, to ensure compliance
to the purchase order?
| ||||||||||||||||||||||||||||
Klinge Coatings Evaluation
| |||||||||||||||||||||||||||||
Reviewed by
|
Points Deducted
| ||||||||||||||||||||||||||||
Observations and remarks:
| |||||||||||||||||||||||||||||
Δεν υπάρχουν σχόλια:
Δημοσίευση σχολίου